Links: 百度
Amazon FBA
FBA Railway
FBA railway + UPS, DPD, GLS delivery (China Europe Express Railway)
1. Shenzhen Chengdu Xinjiang Horgos port / Alashan port Russia Poland extraction (train operation time 14-16 days), UPS delivery, 25-30 days aging
2. Shenzhen → Chongqing 3-5 natural days, train operation time 10-15 natural days, customs clearance + extraction 3-5 working days, delivery 1-3 working days, overall time limit: about 35 natural days (except for domestic and foreign customs inspection)
3. Load the container every day, and the train leaves 4-6 days after loading
4. The transportation time is one third shorter than the sea transportation time, and the transportation price is one third of the air transportation price. The time is stable and the price is stable throughout the year
5. China and Europe fixed point, fixed route, fixed train number, fixed space, fixed time, fixed price
-
Exclusive services
One to one service provided
by service consultant -
Fast response
Respond to the demand in the first
time -
Service transparency
Query business progress at any
time -
Professional and
efficientProfessional team to follow up
service fast and worry free -
Agent for the
whole processProfessional team, one stop
service
Links: 百度
Copyright SHENZHEN TAIWEIDA INT’L LOGISTICS CO.,LTD. 粤ICP备16115366号